Seawork received a call late in the day to attend a Car Carrier Vessel. The requirement was to remove 18 anodes from the rudder and stern post and refit with new ones in a short window before the vessel sailed. All was completed and included a full video survey together with a detailed report showing the locations of the new anodes.

Leave A Comment