Statutory Load Testing at HMS President
Safety, precision and engineering expertise on the River Thames!
With the iconic Tower Bridge as a backdrop, Seawork Marine Services Ltd was recently instructed to undertake statutory load testing of the gangways and access bridge at HMS President, ensuring safe access to the berthing pontoons.
Our engineers carried out a comprehensive inspection of the gangways, hinges, rollers and safety chains before putting the structures to the test.
Using water weights, each gangway was loaded to the required test weight, allowing our engineers to:
- Measure deflection under maximum load
- Confirm there was no permanent deflection once the weights were removed
- Verify the structural integrity and safe working load of each gangway
Following successful testing, a load test identification plate was fitted to each gangway, recording the test details, applied loading and safe working load.
Another successful project completed by the Seawork Marine Services team, combining technical expertise, meticulous testing and a commitment to marine safety.

