Anti-Vortex Plates and Pipework

Following previous works and after the mass concrete plug was cured, Seawork returned to install anti vortex plates and pipework. Precision accuracy was required by the divers installing the system for the design to be effective. The client was highly impressed and has other work for us in the future.

Read More

Culvert Tideflex Valve Plate

Seawork provided the diving services together with the lifting operations to install a Tideflex Valve plate assembly to a culvert discharge. Work involved drilling and resin setting fixings and removal of previous steelwork from the area of wall that the new plate would fix.

Read More

Outfall Maintenance

Seawork were engaged to undertake the replacement of the new tide flex duck bill valves on an outfall in 25 metres of water. Working again from the DSV Curtis Marshall the work was completed and a full inspection with UW video undertaken for the clients records.

Read More

Fast Turnaround on Anodes

Seawork received a call late in the day to attend a Car Carrier Vessel. The requirement was to remove 18 anodes from the rudder and stern post and refit with new ones in a short window before the vessel sailed. All was completed and included a full video survey together with a detailed report showing […]

Read More

Thames Fender Work

Seawork were called in by our long established clients to assist with the removal of a fender that had been damaged by a berthing vessel.

Read More